Projects

Kingsgrove to Revesby Quadruplication

Project Overview

The project involved the construction of a second pair of tracks, each of which is 6.5km long, on the East Hills line. It also included the construction of 10 new rail bridges and the modification of 5 existing bridges, including 1 incremental launch.

Project Description

Quickway were contracted to carry out bridge construction, retaining walls, concrete plinths, capping beams and other associated concrete works.

Details

Number of Bridges: 15 bridges total over rail

Number of Bridge Construction Concurrently: 6 within limited timeframe

Type of Bridge: Overbridge (Main Line & Overpass)

Type of Superstructure: In-situ post tensioned super T girders, precast planks

Type of Substructure: In situ abutments and piers

Type of Parapets: Precast panels with in situ stitch

Key Challenges

  • Interaction with numerous trades including piling contractors
  • Working within live rail corridor
  • In situ post tensioned bridges which included intricate and challenging formwork solutions for post tension cast ins, diaphragms, void formers and flotation mitigation
  • Construction of incremental launch at Salt Pan Creek
Client

Leighton

Asset Owner

Sydney Trains

Duration

3 years

Capabilities
Concrete Structures
Roads & Bridges