Project Overview
The Transmission Cable Alliance (TraCa) was carried out to upgrade the existing Ausgrid transmission network in the greater Sydney area (Newcastle to Sutherland).
Project Description
Quickway were responsible for the construction of electrical transmission concrete in situ pits to accommodate high voltage cable (backfilling of same and reinstatement of roads), the installation of conduit for 33kV and 132kV transmission cables, substation connections and upgrade of systems.
Quickway provided traffic management services on several sections within the overall project also, from plan development to onsite execution of traffic control.